FEATURED PROJECTS
OUR PROJECTS
In this section we present our most recent recent and featured projects.
- Edival: Office building with 2 lifts of 13 stops running in duplex at 1 VVF m / s.
- Tyris : Fitness and Spa Club with 525 kg lift, 1750 kg forklift and stairlift.
- Technological Park: Office building with 4 elevators of 4 stops running in quadruplex of 630 kg, at 1 VVF m / s.
- Residential violante: Housing complex with 8 9-step and 10-stop ladders running in duplex from 450 kg to 1 VVF m / s.
- Onofre: Office building with 4 lifts of 7 stops operating in quadruplex of 750 kg, at 1 VVF m / s and 1 forklift of 630 kg at 1 VVF m / s.
- Colón: Building that combines offices with private housing with 2 gearless lifts without engine room from 450 kg to 1 VVF m / s.
- The canyon: Circular elevator installation in a single family home.
- Borso Offices: Office building with 3 7-stop lifts running on 750 kg triplex, at 1 VVF m / s and 1 1000 kg lifts at 1 VVF m / s. >
- Gran Via: Rehabilitation of building with elevator installation.
- Alameda Spa: Renovation of the building of the Regional Exposition Quarter of Valencia in 1909 with installation of 2 elevators of 630 kg and 1000 kg and stairlifts.
All our projects comply with all applicable regulations. ISO 9001, 18001, EUROPEAN DIRECTIVE ON ELEVATORS 2014/33 / EU, Important modifications to elevators. RD 88/2013.